Party wall dispute
A dispute in the Party Wall sense of the word need not be much of a dispute at all; even if the Act says it is. Under the Party Wall etc. Act 1996, if an adjoining owner doesn’t consent within 14 days of receiving notice of the proposed works then the parties are deemed to be “in dispute”. The way that disputes under the Act are resolved is by each of the owners appointing a surveyor and those surveyors agreeing the terms of Party Wall Agreement.
Even if the adjoining owner decides to concur with their neighbour’s choice of surveyor as “agreed surveyor” (normally a good decision for minor works) there is still a “dispute” to be resolved so an award must be drawn up and served on the owners.
In effect, what an adjoining owner is saying when they instigate a dispute is that they would like to have their interests protected by a person who understands construction matters and is familiar with the procedures under the Party Wall Act.
It could not be easier for an adjoining owner to instigate a dispute; they need do nothing at all. If Party Wall Notices and Notices of Adjacent Excavation are not consented within 14 days of being received then a DISPUTE has arisen.
The adjoining owner may appoint a surveyor (or concur in the appointment of an agreed surveyor) within the 14 day period but they needn’t rush their decision. Once the 14 days have elapsed they must be sent a follow-up letter asking them to appoint a Party Wall Surveyor within 10 days or risk one being appointed on their behalf by the building owner (the party planning the work). If a building owner does gain the right to appoint a surveyor on behalf of their neighbour that cannot be the same surveyor that they are using; an Agreed Surveyor cannot be appointed unless both owners confirm that appointment in writing.
Once a dispute has arisen both the building owner and the adjoining owner change from being “clients” to “appointing owners” - the terminology reinforces the surveyor’s duty to be impartial. A surveyor can serve notice on behalf of their client because at that stage it is not known whether the adjoining owner will consent or not. If they consent there will be no award and no need for a party wall surveyor.
[edit] Related articles on Designing Buildings Wiki
- 10(4) Party Wall Surveyor Appointments.
- Adjoining buildings definition.
- Adjoining owner.
- Fence.
- Institute of party wall surveyors.
- Line of junction notice.
- Party structure notice.
- Party Wall Act.
- Party wall surveyor.
- Preventing wall collapse.
- Responsibility for boundary features.
- Right of support.
- Trespass.
- Wall types.
- What approvals are needed before construction begins.
- Who Pays for Party Wall Surveyor's Fees?
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.